< back

Lodi : Emerson Park - Nuts and Bolts Project

leader: Layne Van Noy
date: April 29, 2017
time: 9:30-12:30
description:
  1.  Emerson Park – Pavers – 11 N. Hutchins Street

Remove, re-bed and replace the existing pavers around the playground and picnic structure. The depressed trip and fall areas range from 4 SF to 12SF. The City will provide bedding sand to placed and compacted under the removed pavers to smooth walk-able surface once the pavers are re-installed. Left over bedding sand shall broad casted and swept over the repair areas to tighten up the paver joints.

Project Leader:  Layne Van Noy
775 544 2416       lbvannoy@gmail.com


 

sign me up!